A lot, and I mean A LOT, of drawings

Things are starting to gather pace now at an excitingly alarming rate. The Team have finished the RIBA Stage 4 tender pack which is now with the Builder – yes we have a preferred builder, more on that later.

The tender pack is made up of about 200 drawings covering all aspects of the design in minute detail which is amazing to see. Amongst other things we now have detailed drawings for hot water schematics, general arrangements (plans), structural designs and fine detail. The Builder is now turning this into a schedule and costed proposal with the aim of us being on contract and starting site ‘mobilisation’ in May!


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s